Mike cuts a piece of casing for one of the windows. |
Mike nails in some casing on the bedroom window. |
Jeff inspects the opening in the front bath room where the homeowner wants to install a casement window. |
Don shows off the opening we created for the bathroom casement window. |
Jeff checks out the garden window that was stored in the bedroom. |
The bedroom floor installed/ |
Bruce plans out the kitchen. |
The finished result of Bruce's long three days of work (with help from the team) - new garden window, cabinets installed, counter tops, sink in and all trimmed out. |
Olivia marks a window in the bedroom in preparation for casing the window out. |
Olivia shows off our finished casing work on the bedroom window. |
Don and Olivia prepare the living room floor for flooring to be installed. |
The living room floor going in. |
No comments:
Post a Comment